NYC Building Upcoming Changes

Posted on

March DOB NOW: Build Requirement for Building Plan Submissions Effective April 9, 2018, all building plans submitted in DOB NOW: Build will be required to include the DOB NOW job number, with the extension that indicates initial (I1), amendment (P1) or subsequent (S1) etc., on the lower right hand side of each drawing sheet.   […]

Project Guidelines

Posted on

The Department of Buildings’ Project Guidelines series have been developed to provide a general overview of the Department’s project requirements for the construction industry. The Project Guidelines contain general operational, administrative, and technical requirements related to construction project type. Use the Project Guidelines during: Pre-approval of a Project – Know what is required to submit a […]